Tower installation: The process begins with the control of the foundation anchor points and the tower segments are assembled sequentially.
Nacelle assembly: The nacelle unit, which includes the generator, gearbox and other main parts, is placed on the tower with the help of a crane with safety precautions.
Blade assembly: The rotor blades are assembled using balance and angular calculations to ensure the aerodynamic performance of the turbine.
Electrical connections: Electrical systems such as transformers, cable connections and control panels are installed and integrated.
Mywind Energy is an innovative and reliable technical service provider specializing in the wind energy sector. We offer comprehensive solutions in areas such as wind turbine installation, major parts replacement, maintenance and repair, troubleshooting, analysis and operational process management.