Installation Service
Tower installation: Tower segments are installed respectively in the process of starting with the control of the basic anchor points.
Nacelle installation: The generator is placed on the tower with the help of crane with gear box and other main parts.
Wing assembly: Rotor wings are assembled with balance and angular calculations and secured the aerodynamic performance of the turbine.
Electrical connections: Electrical systems such as transformer, cable connections and control panels are installed and integrated.
Mywind Energy is an innovative and reliable technical service provider specialized in wind energy industry. We offer comprehensive solutions in areas such as wind turbines installation, large parts exchange, maintenance-free, troubleshooting, analysis and operational process management.
Next Digital 2025 @ All Rights Reserved.
Home

